Integrated systems reactivation · Ongoing support

AXIMA.
Ready for more.

Eight critical rig systems renewed through one integrated programme—and supported throughout AXIMA's continuing operations.

Explore the programme
Aerial view of the AXIMA jack-up rig during its SPS reactivation programme

AXIMA · SPS reactivation programme

350ft rated water depth

A complex reactivation.
One accountable partner.

Following a stacking period, the Marathon LeTourneau Super 116E jack-up entered its Special Periodic Survey and System Integration Testing programme with multiple critical systems requiring renewal.

Monitor Systems surveyed, engineered, built, tested, installed and commissioned eight upgrades across AXIMA—then stayed alongside the rig with the responsive technical support that keeps those systems performing.

Eight upgrades.
Four operational priorities.

Select a numbered marker to explore how marine control, drilling data, safety systems and operational communications were renewed across AXIMA.

Aerial image of AXIMA during the rig reactivation programme

Project photography · Select a system marker

01

Marine control + stability

Ballast, preload and tank intelligence

A renewed control environment connects preload, tank gauging and bulk-tank visibility while retaining proven instrumentation that remained fit for purpose.

22″ Unified operator HMI
  • New PLC racks retrofitted into existing panels
  • TMS LC100 liquid-level computers retained
  • Standalone bulk monitoring integrated with preload control

Reliability,
kept in service.

From resolving obsolescence to integrating new operator interfaces, every system was delivered for safe operation, practical maintenance and long-term support in a demanding offshore environment.

View the original case study
8critical systems upgraded
5main-engine interfaces
350 ftrated water depth
30,000 ftmaximum drilling depth

Monitor Systems Engineering

Let's engineer
what's next.

Talk to our team