Language
Offshore wind · Fibre infrastructure
EAST ANGLIA 3.
Fibre, connected.
113 IP66 stainless-steel fibre-optic junction boxes engineered, assembled and documented for the East Anglia 3 offshore wind farm.
Explore the delivery
East Anglia 3 fibre enclosures · Monitor Systems
01 · The delivery
Built for the wind farm.
Connection by connection.
East Anglia 3 required fibre-optic junction boxes that could bring inter-array cable routes together inside durable, corrosion-resistant enclosures.
Monitor Systems engineered, assembled and documented 113 316L stainless-steel IP66 enclosures in three capacity configurations, from 54 to 162 fibres.
02 · Three capacity configurations
113 enclosures.
One defined build.
Each enclosure was built around its IAC and fibre capacity, with splice trays, duplex bulkheads, pigtails and earth bonding configured for the intended installation.
- 91 × 2 IAC / 108-fibre enclosures
- 4 × 3 IAC / 162-fibre enclosures
- 18 × 1 IAC / 54-fibre enclosures
- 316L stainless steel with IP66 protection
03 · Build and verification
Every connection.
Made traceable.
One mock-up panel was produced for each enclosure type before controlled production and technical documentation carried every unit through assembly, inspection and packing.
.jpg)
.jpg)
.jpg)
04 · Engineering delivery
Built, documented.
Ready to install.
Each enclosure was supplied to its approved configuration with internal earthing continuity, protected packing and an installation-ready technical record.
- Configuration controlThree enclosure types, built to their specified IAC and fibre capacities.
- Mock-up validationOne representative panel for each enclosure type confirmed the build before production.
- Quality recordsInspection, test, material and packing documentation maintained traceability.
- Protected dispatchBubble wrap, moisture-lined wooden crates and secured accessories prepared each unit for transport.
Renewables case study